| Tender ID | 4608088 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Corrigendum : Construction Of Road From Patua To Kasibani Via Sikidia |
| Last Date For Submission | 9th Jul, 2026 |
| Opening Date | 10 Jul, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 398970.00 |
| Estimated Cost | 39897000.00 |
| City | Baripada |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other sturcture comprising of masonry, cement concrete wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead of 1000m as per Technical Specification Clause 202 | 45.000 | cum |
| 2 | Clearing and grubbing the road land including uprooting Rank vegetation grass bushes shrubs etc complete. | 20,000.000 | sqm |
| 3 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by mechanical means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & Clause 305 of MOSRT&H specifications for Road & Bridges work (4th Revision). With mechanical lead upto 1000m | 14,132.230 | cum |
| 4 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 84.280 | cum |
| 5 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site). | 957.770 | cum |