Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4596900 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Corrigendum : Deulia-patisari-balichilima Road |
| Last Date For Submission | 9th Jul, 2026 |
| Opening Date | 10 Jul, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 704070.00 |
| Estimated Cost | 70407000.00 |
| City | Baripada |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials by manual means and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 but excluding the charges of GST etc. complete & as per direction of the Engineer in Charge. | 12,672.000 | sqm |
| 2 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified materials with in all lifts and lead upto 1000 metres etc complete. | 11,880.000 | sqm |
| 3 | Dismantling of existing structures like culverts, bridges, retaining walls and other sturcture comprising of masonry, cement concrete wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead of 1000m as per Technical Specification Clause 202 | 165.000 | cum |
| 4 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by mechanical means, spreading, grading to required slope and compacting to meet requirement of table 300-2 & clause 305 of MoRTH specifications for Road & Bridge works (4th revision) but excluding the charges of GST etc complete as per specification & direction of Engineer in Charge.. | 15,240.570 | cum |
| 5 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 2,840.120 | cum |
15 Days Left