Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4647535 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Corrigendum : Pwd Road - Kanchapal |
| Last Date For Submission | 9th Jul, 2026 |
| Opening Date | 10 Jul, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 644390.00 |
| Estimated Cost | 64439000.00 |
| City | Baripada |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials by manual means and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 but excluding the charges of GST etc. complete & as per direction of the Engineer in Charge. | 22,900.000 | sqm |
| 2 | Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 13,140.000 | sqm |
| 3 | Construction of embankment with approved materials obtained from borrow pits transporting to site with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 and as per the direction of the Engineer in Charge. | 19,095.190 | ccm |
| 4 | Earthwork in excavation for foundation of structures in all types of soil as per drawing and technical specification Clause 305 and 1104 of MoRD includding setting out, construction of shoring and bracing, removal of stumps and other deleterious material | 3,836.000 | ccm |
| 5 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site). | 992.530 | ccm |
15 Days Left