| Tender ID | 4654512 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Corrigendum : Road From Hatikote Primary School To Nuadihi Under Hatikote Gp |
| Last Date For Submission | 9th Jul, 2026 |
| Opening Date | 10 Jul, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 297810.00 |
| Estimated Cost | 29781000.00 |
| City | Baripada |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 50 mtr outside the periphery of the area and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per specification and as per the direction of Engineer in charge. | 10,560.000 | sqm |
| 2 | Dismantling of Cement Concrete Grade M-15 & M20 including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres | 137.400 | cum |
| 3 | Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works including T&P, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metresUpto 600mm dia | 30.000 | rm |
| 4 | Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works including T&P, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres600mm to 900mm dia | 7.500 | rm |
| 5 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m complete and as per specification and as per the direction of Engineer in charge. | 170.780 | cum |