Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Water Resources Department
Tender ID3608595
Organisation NameWater Resources Department
Tender BriefCorrigendum : Estimate For Relining Lining Of Wc By Laying Underground Pipeline Of Ol Rd 106870r Of Handiaya Mr Of Barnala Disty Village Handiayad, Khudi Distt.barnala Laying And Jointing Of Rcc Ugpl System And Other Allied Works In Construction Of Watercourse
Last Date For Submission20th Mar, 2026
Opening Date20 Mar, 2026
Cost
Document Cost590.00
EMD36000.00
Estimated Cost1800000.00
Location
CityBarnala
StatePunjab

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 0 to 1.5 mtr.1.000Cum
2Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 1.5 to 2.25mtr.1.000Cum
3Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 2.25 to 3mtr.1.000Cum
4Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.1.000Cum
5First class burnt brick laid in cement sand mortar 1:6 for bed and side wall [Item No 11.3(i)].1.000Cum
20th Mar, 2026

6 Days Left