Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Rural Engineering Department
Tender ID4463626
Organisation NameRural Engineering Department
Tender BriefChurihari Kuwahata Pitch Sadak Se Prathmik Swastha Kendra Hote Huye Mahulani Gaon Tak Shunya Se Lepan Karya
Last Date For Submission6th Jun, 2026
Opening Date08 Jun, 2026
Cost
Document Cost2714.00
EMD134000.00
Estimated Cost6712000.00
Location
CityBasti
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. Non thorny jungle) ( By Mechanical Means) P.W.D. S.I. No 2593750.00Sqm
2E/W in excavation in ordinary soil including lift 1.50 mtr and lead up to 30 mtr and including filling watering ramming of excavated earth into the trenches or into the space of between the building and side the foundation trench or into the plinth and removal and disposal of surplus earth as per direction by E/I upto a distance of 30m from the foundation trenches including all T&P phowereh and basket etcas per S.I. No. 251 (For GSB Trenches)71.88Sqm
3Construction of Embankment with approved soil with a lift upto 1.5 m laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet requirement of table 300.1 and 300.23035.00Cum
4Construction of Embankment with approved soil with a lift upto 1.5 m and lead 1000 mts laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet requirement of table 300.1 and 300.2527.00Cum
5Construction of Subgrade and Earthen Shoulder with approved soil with all lifts and leads, laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet at least 100 % procter density complete to specification requirements562.50Cum
6th Jun, 2026

4 Days Left

WhatsApp