Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4012250 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Renewal Of Pakari Udaipur Link Road |
| Last Date For Submission | 30th Apr, 2026 |
| Opening Date | 30 Apr, 2026 |
| Document Cost | 2714.00 |
|---|---|
| EMD | 1675000.00 |
| Estimated Cost | 29500000.00 |
| City | Basti |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. As per JMF With All Aspects (Rates are Excluding G.S.T but Including All Taxes, Royalty, Labour cess, Material & T&P.) | 80.000 | Cum |
| 2 | Providing and applying tack coat with Bitumen grade using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer & Cleaned with Hydraulic broom as per Technical Specification Clause 503.over stablized and DBM surface) With All Aspects (Rates are Excluding G.S.T but Including Cost of Bitumen, All Taxes, Labour cess & T&P.) | 56560.000 | Sqm |
| 3 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects As per JMF With All Aspects (Rates are Excluding G.S.T but Including Cost of Bitumen, All Taxes ,Royalty, Labour cess, Material & T&P.) | 1690.000 | Cum |
8 Days Left