Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4258393 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Cleaning Of Maint Of Sewage Pump House And Stps Of Different Locations At North Campus Under Ge (u) Bathinda |
| Last Date For Submission | 10th Jun, 2026 |
| Opening Date | 12 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 99800.00 |
| Estimated Cost | 4990000.00 |
| City | Bathinda |
|---|---|
| State | Punjab |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dewatering/bailing out raw sewage and cleaning the open sewage collection tank of any sizes, with the help of pressure jet pump & other required equipments and removing any silt, sludge, raw material of sewage from the well with the help of any T & P as required and throwing it away 100 mtr from the STP and white wash to walls complete all as directed by Engineer-in-Charge. (All STPs). | 4 | Each Job |
| 2 | Cleaning and removing sludge from walls /floor of one Nos Equilization tank off sizes, with the help of pressure jet pump & other required equipments and removing any silt, sludge, raw material of sewage from the well with the help of any T & P as required and throwing it away 100 mtr from the STP and white wash to walls complete all as directed by Engineer-in-Charge. (All STPs). | 4 | Each Job |
| 3 | Cleaning and removing sludge from walls /floor of one Nos Treated water tank, with the help of pressure jet pump & other required equipments and removing any silt, sludge, raw material of sewage from the well with the help of any T & P as required and throwing it away 100 mtr from the STP and white wash to walls complete all as directed by Engineer-in-Charge. (All STPs). | 4 | Each Job |
| 4 | Cleaning,removing and bailing out stagnated sewage or sludge from walls/floor and any light particle with the help of pressure jet pump & other required equipments from MBBR Reactor inner surface off sizes and taking out damaged and unbroken MBBR media without any damage and refilling it in each MBBR, cleaning of inner and outer surface of MS pipe placed in MBBR and removing any sludge particle from it and white wash to walls complete all as directed by Engineer-in-Charge. (All STPs). Note : New media for topping up will be paid and measured separately under respective item of BOQ. | 4 | Each Job |
| 5 | Cleaning and removing of sludge from walls/floor of tube settler tank off sizes after taking out the tube settler media with the help of pressure jet pump & other required equipments and depositing where directed at a distance 100 mtr away from outer wall of STP including taking out old rusted wire mesh and cleaning fixing wire mesh of same size with the tube settler and fixed in original position in the tube settler tank and white wash to walls complete all as directed by Engineer-in-Charge. (All STPs). Note : New media for topping up will be paid and measured separately under respective item of BOQ. | 4 | Each Job |
6 Days Left