Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4963438 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Provn Of Construction Of Four Guard Rooms Along With Toilets Cum Bathrooms Repair Bay Two Inspection Pits Tools And Mt Stores Paint Store And Fol Store Covered Under Various Lbw Works Under Ge ( North) Bathinda At Bathinda Mil Stn |
| Last Date For Submission | 14th Aug, 2026 |
| Opening Date | 17 Aug, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 195000.00 |
| Estimated Cost | 11986500.00 |
| City | Bathinda |
|---|---|
| State | Punjab |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Surface dressing not exceeding 15 cm deep and getting out in soft / loose soil complete all as specified and as directed by Engineer-in-Charge. | 1240.00 | Sqm |
| 2 | Removing excavated material (soil ) exc. 1.50 km but not exceeding 5 km and depositing where directed complete all as specified and as directed by Engineer -in-charge. | 24.00 | Cum |
| 3 | Excavation in trenches not exceeding 1.5 meter wide and not exceeding 1.5 meter depth for foundation etc or for shafts , wells, cesspits, manholes , septic tank, for laying of cables , laying of pipes not exceeding 10 Sqm on plan and not exc 1.5 meter depth and getting out in soft/loose soil etc complete all as specified and as directed by Engineer-in- charge. | 579.80 | Cum |
| 4 | Material and labour for Cement Concrete 1:4:8 , Type D-2 using 40 mm graded stone aggregate as in foundation filling and mass concrete complete all as specified and as directed by Engineer-in-charge. | 78.40 | Cum |
| 5 | Material and labour for RCC M-25 (Design mix) using 20 mm graded stone aggregates as in foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete complete all as specified and as directed by Engineer-in-charge. NOTE : Reinforcement and form work shall be measured and paid for separately under appropriate item of this schedule. | 56.00 | Cum |
6 Days Left