Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4645940 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Provn Of Two 100 Kva Three Phase Online Ups With 45 Minutes Backup Time And 160 Kva Transformer And Connected Work Under Ge (u) Bathinda At Bathinda Mil Stn |
| Last Date For Submission | 22nd Jul, 2026 |
| Opening Date | 24 Jul, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 178000.00 |
| Estimated Cost | 10273800.00 |
| City | Bathinda |
|---|---|
| State | Punjab |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in trenches, n exc 1.5m wide and n. exc 1.5m in depth; for laying of cables ,poles stays , foundation, etc.and getting out.in any type of soil complete all as specified and directed. | 273.37 | Cum |
| 2 | Returning, filling in includidng spreading leveling watering and well ramming in layers not exc 25cm.thick complete all as specified and directed. | 266.72 | Cum |
| 3 | Removing excavated material from site n exc. 50 m and depositing where directed at a level n exc. 1.5m above the starting point complete all as specified and directed. | 6.65 | Cum |
| 4 | Supply and laying HDPE DWC of 103 mm innner dia and 120 mm outer dia for underground electrical cable protection, 750 N as per IS 16205, colour - Orange, BIS approved certified with HDPE material test certified complete all as specified and directed by Engr-in-Charge and GE. Note :- Old unserviceable material should be deposited to the MES E/M stroe by the contractor by his own arrangements without any financial benefits complete all as specified by Engineer in Charge and GE. | 525.00 | RM |
| 5 | Supply and laying HDPE DWC of 63 mm innner dia and 75 mm outer dia for underground electrical cable protection, 750 N , laid in trenches/ducts or fixed to poles/walls or laid under roads/paths/drains/culverts complete all as specified and directed by Engr-in-Charge and GE. | 162.00 | RM |
6 Days Left