Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID4536858
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Addition, Alteration To The Existing Sharqat Auditorium To Incl Additional Toilets, Seating And Repair To Existing Projector At The Maratha Lirc Belagavi Under Ge Belgaum
Last Date For Submission13th Jul, 2026
Opening Date15 Jul, 2026
Cost
Document Cost1000.00
EMD192600.00
Estimated Cost11760000.00
Location
CityBelagavi
StateKarnataka

Register to see full details

BOQ Items
#ItemQtyUnits
1Excavation in trenches not exceeding 1.5m wide and not exceeding 10 Sq.m on plan area and not exceeding 1.5m deep in any type of soil, for foundation etc., or for laying of cable/ GI Pipe, shafts, wells, cesspits, manholes, pier holes, etc., complete all as specified.102Cubic Metre
2Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25cm thick of excavated soil, as in any type of soil, complete all as specified. Note: A deduction of 10% shall be made from total computed volume of filling to cater in bulk irrespective of machinery used for ramming.43Cubic Metre
3Removal of excavated material [Soil] to a distance not exceeding 50m and depositing where directed at a level not exceeding 1.5m above the starting point, complete all as specified.134Cubic Metre
4Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30cm in depth, 1.5m in width as well as 10Sqm on plan) not exceeding 1.50 m in depth and including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m, as in all kind of soil, complete all as directed by Engineer-in-Charge.75Cubic Metre
5M&L for Moorum/Red bajri filling brought from out side MD land including filling in floors or pavings or in foundations laid in layers n.exc. 15cm thick spread, levelled and rammed including watering, complete all as specified and as directed. Note: A deduction of 10% shall be made from total computed volume of filling to cater in bulk irrespective of machinery used for ramming.10Cubic Metre
13th Jul, 2026

6 Days Left

WhatsApp