Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID4525244
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Special Repair To Road At Certain Locations At The Maratha Lirc Under Ge Belagavi
Last Date For Submission10th Jul, 2026
Opening Date13 Jul, 2026
Cost
Document Cost1000.00
EMD130300.00
Estimated Cost7015600.00
Location
CityBelagavi
StateKarnataka

Register to see full details

BOQ Items
#ItemQtyUnits
1M&L 7.5 cm thick (compacted thickness) WBM, with coarse aggregates of grading 2 (63 to 40 mm size) or of grading 3 (50 to 20 mm size) spread rolled and consolidated to gradient materials and camber required and including preparation of unsurfaced WBM surface (to receive BM or SDAC as applicable) and applying evenly a priming / tack coat with bituminious primer @ 10 Kg per 10 Sqm and scarifyng or picking gravelled macadam or bituminous macadam surface in area not exc. 400 Sqm and depth exc. 50 mm and not exc. 100 mm thick complete all as specified and directed.5010 Sqm
2M&L premix bituminous macadam with 4% binder content (paving bitumen) laid or rolled and compacted to required gradient camber (consolidation thickness 75 mm or less) complete all as specified and directed.70Cum
3M/L preparing surfaces of black top by wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surfaces with gunny bags to remove all loose dirt etc; and including applying evenly priming / tack coat with hot bituminous primer at 5 kg per 10 sqm complete all as specified and directed.85310 Sqm
4M&L bituminous premixed semi-dense asphaltic concrete 40 mm consolidated thickness with 5.5% binder content using paving bitumen of grade VG - 30 penetration by weight of total mix laid using mechanical paver, rolled and compacted to required gradient and camber complete all as specified and directed. 90310 Sqm
5Note: For design purpose min. binder content is specified as 5.5% for VG-30 grade bitumen and it shall not reduce under any circumstances. During design stage, if binder content exceeds 5.5% no extra payment shall be made to contractor for excess use of binder.
10th Jul, 2026

6 Days Left

WhatsApp