| Tender ID | 4525244 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Special Repair To Road At Certain Locations At The Maratha Lirc Under Ge Belagavi |
| Last Date For Submission | 10th Jul, 2026 |
| Opening Date | 13 Jul, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 130300.00 |
| Estimated Cost | 7015600.00 |
| City | Belagavi |
|---|---|
| State | Karnataka |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | M&L 7.5 cm thick (compacted thickness) WBM, with coarse aggregates of grading 2 (63 to 40 mm size) or of grading 3 (50 to 20 mm size) spread rolled and consolidated to gradient materials and camber required and including preparation of unsurfaced WBM surface (to receive BM or SDAC as applicable) and applying evenly a priming / tack coat with bituminious primer @ 10 Kg per 10 Sqm and scarifyng or picking gravelled macadam or bituminous macadam surface in area not exc. 400 Sqm and depth exc. 50 mm and not exc. 100 mm thick complete all as specified and directed. | 50 | 10 Sqm |
| 2 | M&L premix bituminous macadam with 4% binder content (paving bitumen) laid or rolled and compacted to required gradient camber (consolidation thickness 75 mm or less) complete all as specified and directed. | 70 | Cum |
| 3 | M/L preparing surfaces of black top by wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surfaces with gunny bags to remove all loose dirt etc; and including applying evenly priming / tack coat with hot bituminous primer at 5 kg per 10 sqm complete all as specified and directed. | 853 | 10 Sqm |
| 4 | M&L bituminous premixed semi-dense asphaltic concrete 40 mm consolidated thickness with 5.5% binder content using paving bitumen of grade VG - 30 penetration by weight of total mix laid using mechanical paver, rolled and compacted to required gradient and camber complete all as specified and directed. | 903 | 10 Sqm |
| 5 | Note: For design purpose min. binder content is specified as 5.5% for VG-30 grade bitumen and it shall not reduce under any circumstances. During design stage, if binder content exceeds 5.5% no extra payment shall be made to contractor for excess use of binder. |