Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5525670 |
|---|---|
| Organisation Name | South Western Railway |
| Tender Brief | Corrigendum : Supply Of Polyester Fibre Filled Pillow For 1ac Coach As Per Specification Is 18930:2024 Or Latest. (1)filled With Siliconized Virgin Hollow Conjugated 15 Denier Polyester Fibre Conforming To Table 4 Of Is 18930:2024 Or Latest. (2)casing Fabric Conforming To Type-1 Of Table-1 Of Is:18930:2024 Or Latest. (3)size - 55 Cm X 40 Cm, With A Mass Of Fibre Filling Of 420 Gm, And Tolerance As Per Table 5 Of Is 18930:2024 Or Latest. (4)outer Protective Cover As Per Para 4.3 Of Table 5 Of Is 18930:2024 Or Latest And The Size Of The Cover Shall Be Length: 55 Cm (tolerance: +2 Cm) And Breadth: 40 Cm (tolerance: +1 Cm). (5)colour Of Pillow Casing/inner Primary Cover And Outer Protection Cover -grey (pantone Shade :16-3915 Tpg). (6)piping: A Cotton Cord Sewn On All Four Sides Of The Casing Pillow Should Be Provided To Help The Pillow To Maintain Its Desired Shape. (7)marking: (i)for The Outer Protective Cover: Woven Tag Marked With Ir Monogram Along With Manufacturer's Name, Initial Or Trademark, Size (lxb) And Blend Composition Of Outer Protective Cover , Month & Year Of Manufacture, Calendar Marking Along With Bis Standard Mark, Should Be Stitched Along With Seam At One Corner Edge, Capable Of Withstanding Repeated Washing. (ii)for The Casing: Woven Tag Marked With Ir Monogram Along With Manufacturer's Name, Initial Or Trademark, Size (lxb),type Of Fibre Fill, Mass Of Fibre Fill, Type Of Casing Fabric (blend Composition), Month & Year Of Manufacture, Calendar Marking Along With Bis Standard Mark, Should Be Stitched Along With Seam At One Corner Edge, Capable Of Withstanding Repeated Washing. [ Warranty Period: 30 Months After The Date Of Delivery ] |
| Last Date For Submission | 14th Oct, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 0.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 0.00 |
| City | Bengaluru |
|---|---|
| State | Karnataka |
34 Days Left