| Tender ID | 3878698 |
|---|---|
| Organisation Name | University Of Jammu |
| Tender Brief | Corrigendum : Construction Of Balance Work Of Staff Quarter To Professor Hod Building At Bhaderwah Campus |
| Last Date For Submission | 21st Apr, 2026 |
| Opening Date | 23 Apr, 2026 |
| Document Cost | 7080.00 |
|---|---|
| EMD | 412192.00 |
| Estimated Cost | 20609583.00 |
| City | Bhaderwah |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil 50 m beyond 1m from cutting edge. | 375.94 | Cum. |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) . | 25.14 | Cum. |
| 3 | Providing and laying cement concrete 1:5:10 (1 cement: 5coarse sand: 10 graded crushed brick aggregate 40mm nominal sizes) in foundation and plinth including machine mixing, finishing, consolidation, curing and including form work complete. | 23.73 | Cum. |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 84.29 | Cum |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level. | 5.62 | Cum. |