Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4456365 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Construction Of Flood Protection Works At Chilly Bhatyas Nallah On L Side R Side Fpw At Bhatyas Bamboo, Bathri On Kalgoni Nallah, Bonjwa Area Kalnai Nallah And Malanoo Site At Spots In Sub Division Gandoh |
| Last Date For Submission | 19th Jun, 2026 |
| Opening Date | 20 Jun, 2026 |
| Document Cost | 1500.00 |
|---|---|
| EMD | 159220.00 |
| Estimated Cost | 7961000.00 |
| City | Bhallessa |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 70% All kinds of soil, Ordinary Rock 30% | 1130.33 | Cum |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 80% All kinds of soil : Ordinary Rock 20 % | 232.00 | Cum |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 20.31 | cum |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 | 339.35 | Cum |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 132.82 | Cum |
3 Days Left