Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3797572 |
|---|---|
| Organisation Name | Local Self Government Department |
| Tender Brief | Corrigendum : Construction And Maintanance Of Drain And Cross Work In New Ward No. 31 To 39 |
| Last Date For Submission | 1st Apr, 2026 |
| Opening Date | 02 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 33740.00 |
| Estimated Cost | 1687000.00 |
| City | Bharatpur |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Lime Concrete, cement concrete grade M-10 (1:5:10) and below | 36.00 | Cum |
| 2 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m | 432.00 | Cum |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 36.00 | Cum |
| 4 | 40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 ( 1cement : 5 coarse sand) with joints finished flush. Red sand stone | 480.00 | Sqm |
| 5 | Brick work with FPS bricks of class designation 75 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) | 45.00 | Cum |
3 Days Left