| Tender ID | 79602 |
|---|---|
| Organisation Name | Public Health Engineering Department |
| Tender Brief | Corrigendum : Work For Construction Of Intake Well Inside Chambal River Including Approach Bridge Construction Of Rwr Including All Works Required For Inlet Inside Rwr Outlet System From Rwr To Outlet Chamber Wtp Cwr Rwph And Allied Works Package 1 Under Jjm |
| Last Date For Submission | 18th Jun, 2026 |
| Opening Date | 19 Jun, 2026 |
| Document Cost | 118000.00 |
|---|---|
| EMD | 244572584.00 |
| Estimated Cost | 12228629224.00 |
| City | Bharatpur |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Design, construction, testing and commissioning of Rapid Gravity Filter Treatment Plant including all relevant civil, electrical , mechanical ,instrumentation, automization and SCADA works, chemical building and stores along with ancillary civil works as defined in scope of work, technical specification and provisions of CPHEEO manuals for the following capacity . | ||
| 2 | WTP Capacity 354 MLD (output demand) (16091KLH @22 Hour | ||
| 3 | Cost of 5000 KLH | 1.00 | Each |
| 4 | Cost above 5000 KLH and up to 75000 KLH | 11091.00 | KLH |
| 5 | Manufacturing, supplying ,lowering, laying and jointing in position to correct line spirally welded SAW/Fabricated MS Pipe having bevelled end plates / coils, confirming to IS 3589-2001 or its latest revision/ amendments, for following thickness and inside diameter, including all taxes (Central and local), transportation and freight charges, inspection charges, loading/ unloading charges, including cost of labour and material, specials (Tee, bend etc.), field joints, satisfactory hydraulic testing, disinfection, commissioning etc. complete as per technical specifications and direction of Engineer-in-charge; (excluding earthwork, internal lining and outer coating). Note : Providing and fixing of all requisite specials as per drawing, design and layout are inclusive in RM measurement of the item and shall not be paid separately. |