| 1 | Engineering, Procurement, Construction (EPC) for 2 Nos X 30 TPH + 2 Nos X 75 TPH AFBC Boilers with Deaerator cum Storage Tank, Bunkers, LP & HP Chemical Dosing System, FANS, BFPs, APH, Economiser, Ducting, Insulation and Painting, Steam piping, PRDS, Pipe Racks, Steam Turbines of 2 Nos X 7 MW + 2 Nos X 7 MW with Auxiliaries & HT Alternator, & E&C, Coal Handling Plant and Ash Handling System, Main and Aux cooling tower with Piping, WTP Considering Clarifier & DM Plant, DM water storage tank, Civil cost including RCC Chimney, Electrical and Instrument Package, Misc. like firefighting, EOT Crane, Air Conditioning , Lab Equipment & Ventilation, With Erection, Packing ,Freighting Cost, 11 KV or 66 KV Infra cost for Power evacuation, Filling Cost, Spares Cost etc. requirement mentioned in scope of work and tender documents. Above is the minimum requirement, the bidder shall quote his price for the requirements indicated in price schedule. The bidder shall verify other principal items at his end independently and consider the same if required. It is not limited to mentioned scope of work and tender specifications items but to achieve required performance as mentioned in tender, additional items/systems need to considered without additional cost, as per final approved design and as directed by Engineer in charge. | 1.000 | LS |
| 2 | 1st year Operation and Maintenance and Repairing and Replacement for entire steam plant systems scope covered in this work as specified in tender documents. O&M&R & Replacement work start after completion of Testing, Commissioning and trial run, the agency shall have to bear all the cost of the chemical, equipments, material, consumable (oil and grease etc), manpower and handling & disposal of all type of hazardous wastes/ hazardous Ash including waste grit, waste/spent oil, statutory compliances. Client will bear the cost of Electricity, water, coal for steam plant and DG set-fuel for Comprehensive O&M&R& Replacement period. | 1.000 | LS |
| 3 | 2nd year Operation and Maintenance and Repairing and Replacement for entire steam plant systems scope covered in this work as specified in tender documents. O&M&R & Replacement work start after completion of Testing, Commissioning and trial run, the agency shall have to bear all the cost of the chemical, equipments, material, consumable (oil and grease etc), manpower and handling & disposal of all type of hazardous wastes/ hazardous Ash including waste grit, waste/spent oil, statutory compliances. Client will bear the cost of Electricity, water, coal for steam plant and DG set-fuel for Comprehensive O&M&R& Replacement period. | 1.000 | LS |
| 4 | 3rd year Operation and Maintenance and Repairing and Replacement for entire steam plant systems scope covered in this work as specified in tender documents. O&M&R & Replacement work start after completion of Testing, Commissioning and trial run, the agency shall have to bear all the cost of the chemical, equipments, material, consumable (oil and grease etc), manpower and handling & disposal of all type of hazardous wastes/ hazardous Ash including waste grit, waste/spent oil, statutory compliances. Client will bear the cost of Electricity, water, coal for steam plant and DG set-fuel for Comprehensive O&M&R& Replacement period. | 1.000 | LS |