| Tender ID | 4555964 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Corrigendum : Construction Of Rd Road To Kumbharbaru Road In The District Of Kalahandi Under Mukhya Mantri Sadak Yojana For The Year 2026-27 |
| Last Date For Submission | 4th Jul, 2026 |
| Opening Date | 06 Jul, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 354050.00 |
| Estimated Cost | 35405000.00 |
| City | Bhawanipatna |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 50 mtr outside the periphery of the area and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per specification and as per the direction of Engineer -in charge. | 13488.00 | Sqm |
| 2 | Earth work in excavation of in hard or gravelly soil with initial lead and lift including dressing the sides & leveling the bed of the foundation to the required width & required depth including dewatering if necessary and stacking the excavated materials away from working area etc.complete and as per specification and as per the direction of Engineer -in charge. | 1810.11 | Cum |
| 3 | Earth work in excavation of in stoney earth with initial lead and lift including dressing the sides & leveling the bed of the foundation to the required width & required depth including dewatering if necessary and stacking the excavated materials away from working area etc.complete and as per specification and as per the direction of Engineer-in-charge. | 646.47 | Cum |
| 4 | Earth work in excavation of in disintegrated rock not requiring blasting to be removed by pick axes and crow bars and depositing material with initial lead and lift including dressing the sides & leveling the bed of the foundation to the required width & required depth including dewatering if necessary and stacking the excavated materials away from working area etc.complete and as per specification and as per the direction of Engineer-in-charge. | 129.29 | Cum |
| 5 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by manual means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & clause 305 of MoSRT&H Specifications for Road & Bridge works (4th Revision)and as per the direction of engineer in charge. | 13351.00 | Cum |