| Tender ID | 3762213 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Corrigendum : Kumkhal Rd Road To Khilapadar |
| Last Date For Submission | 21st Apr, 2026 |
| Opening Date | 22 Apr, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 479220.00 |
| Estimated Cost | 47922000.00 |
| City | Bhawanipatna |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 50 mtr outside the periphery of the area and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per specification and as per the direction of Engineer -in charge. | 17240.00 | Sqm |
| 2 | Scarifying the existing bituminus road surface to a depth of 50m and disposal of scarified material within all lifts and lead upto 1000mt. and as per the direction of Engineer-in-charge. | 240.00 | Sqm |
| 3 | Reworking the scarified bituminus surface suitably after supplementing the base materials with stone screened dust compacting finished surface as per Clause No 501.8.3.2 of Mort &H specification for raod & Bridge works (4th Revision) and as per the direction of Engineer-in-charge. | 240.00 | Sqm |
| 4 | Earth work in excavation of in hard or gravelly soil with initial lead and lift including dressing the sides & leveling the bed of the foundation to the required width & required depth including dewatering if necessary and stacking the excavated materials away from working area etc.complete and as per specification and as per the direction of Engineer -in charge. | 420.00 | Cum |
| 5 | Earth work in excavation of in disintegrated rock not requiring blasting to be removed by pick axes and crow bars and depositing material with initial lead and lift including dressing the sides & leveling the bed of the foundation to the required width & required depth including dewatering if necessary and stacking the excavated materials away from working area etc.complete and as per specification and as per the direction of Engineer-in-charge. | 180.00 | Cum |