Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3762258 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Corrigendum : Phuldumer To Patangpadar Junction |
| Last Date For Submission | 21st Apr, 2026 |
| Opening Date | 22 Apr, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 454720.00 |
| Estimated Cost | 45472000.00 |
| City | Bhawanipatna |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 50 mtr outside the periphery of the area and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per specification and as per the direction of Engineer -in charge. | 12858.75 | Sqm |
| 2 | Scarifying the existing bituminus road surface to a depth of 50m and disposal of scarified material within all lifts and lead upto 1000mt. and as per the direction of Engineer-in-charge. | 624.00 | Sqm |
| 3 | Earth work in excavation of in hard or gravelly soil with initial lead and lift including dressing the sides & leveling the bed of the foundation to the required width & required depth including dewatering if necessary and stacking the excavated materials away from working area etc.complete and as per specification and as per the direction of Engineer -in charge. | 894.60 | Cum |
| 4 | Earth work in excavation of in disintegrated rock not requiring blasting to be removed by pick axes and crow bars and depositing material with initial lead and lift including dressing the sides & leveling the bed of the foundation to the required width & required depth including dewatering if necessary and stacking the excavated materials away from working area etc.complete and as per specification and as per the direction of Engineer-in-charge. | 319.50 | Cum |
| 5 | Blasting hard rock and compacted sheet rock excluding sand stone measured in solid including jumping holes cost of explosive fuse, detonator etc and stacking the blasted debris clear of work within 50 m lead etc complete as per the direction of the Engineer-in-charge. | 63.90 | Cum |
16 Days Left