Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3762222 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Corrigendum : Pwd Road To Ghantabahali Via Chahagaon |
| Last Date For Submission | 21st Apr, 2026 |
| Opening Date | 22 Apr, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 308320.00 |
| Estimated Cost | 30832000.00 |
| City | Bhawanipatna |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 50 mtr outside the periphery of the area and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per specification and as per the direction of Engineer -in charge. | 8080.00 | Sqm |
| 2 | Scarifying the existing bituminus road surface to a depth of 50m and disposal of scarified material within all lifts and lead upto 1000mt. and as per the direction of Engineer-in-charge. | 816.00 | Sqm |
| 3 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by manual means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & clause 305 of MoSRT&H Specifications for Road & Bridge works (4th Revision)and as per the direction of engineer in charge. | 12158.81 | Cum |
| 4 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site). | 1292.46 | Cum |
| 5 | Supplying & filling moorum of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge. | 883.13 | Cum |
16 Days Left