Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID4290637
Organisation NamePublic Works Department
Tender BriefCorrigendum : Construction Of Four Class Room And 02 Unit Toliet, Kitchen Shed, Or Drinking Water Facility At Govt. Senior Secondary School Gordhanpura , Bagore, Distt. Bhilwara (raj.)
Last Date For Submission1st Jun, 2026
Opening Date02 Jun, 2026
Cost
Document Cost1000.00
EMD120920.00
Estimated Cost6046000.00
Location
CityBhilwara
StateRajasthan

Register to see full details

BOQ Items
#ItemQtyUnits
1PART 'I' CONSTRUCTION OF FOUR CLASS ROOM & 02 UNIT TOLIET, KITCHEN SHED, OR DRINKING WATER FACILITY AT GOVT. SENIOR SECONDARY SCHOOL GORDHANPURA , BAGORE, DISTT. BHILWARA (RAJ.) PART "A" CIVIL WORK (16' X 20' ) Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils129.35Cum
2Earth work in excavation/ by mechanical means (Hydraulic Excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50 m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed: Hard rock(blasting prohibited) useful material 30%200.25Cum
3Providing and laying in position cement concrete including curing compaction etc. complete in spcified grade excluding the cost of centering and shuttering all work upto plinth level 1:4:8(1 cement:4 Coarse sand :8 graded stone aggregate 40 mm nominal size).14.64Cum
4Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for foundation, footings, strap beam, raft, base of column etc84.53Sqm
5Steel Reinforcement:-P/F reinforcement for RCC work including straightening,cutting, bending, placing in position and binding (including cost of binding wire) all complete upto floor five level ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) Thermo-mechanically Treated bars (Conforming of relevent IS code)5324.80Kg
1st Jun, 2026

5 Days Left

WhatsApp