Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5019159 |
|---|---|
| Organisation Name | Urban Improvement Trust |
| Tender Brief | Repair And Maintenance Work (arc) For Air Conditioners Installed In The Trust Office And Government Buildings. |
| Last Date For Submission | 30th Jul, 2026 |
| Opening Date | 31 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 9980.00 |
| Estimated Cost | 499000.00 |
| City | Bhilwara |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Supplying and charging of fresh refrigerant and testing of performance of air conditioner/ fridge/ water cooler of following capacity including capallary and strainer/ filter. 1.5 TR Window/ Split A.C. | 40.00 | Each |
| 2 | Dismentling of split air conditioner of any capacity/any type including existing indoor unit & outdoor unit , refrigerant piping , connecting cables , drain pipe etc. including shifting of dismentaled material to store complete as required | 10.00 | Job |
| 3 | Supply & fixing MS powder coated stand suitable for 1.0/1.5/ 2.0 Tr outdoor type of Split AC. All as per pre approved by Engineer in charge. | 5.00 | Each |
| 4 | SITC of Interconnecting refrigerant copper pipe for split/Ductable/ Casseette AC of DHE Grade C12200- ASTM B68, B75, chemical composition of copper %- 99.0 Min and Phosphorus %- 0.015 to 0.040 . For Annealed copper tube :- Tensile strength = 210 Mpa wih elongation % = 40 Min . Ink Mark Brand Printing on Hard Tubes should be present. Piping between each set of indoor & outdoor units of different sizes as per OEM requirement & specifications including class 'O' Nitrile rubber sleeves (size as per item no. 22.43),7 mil Glass Cloth with 3 coats of anti UV paint (on area which is exposed to weather) chase cutting, supports, making good the same with sand cement plaster etc. as required. | 5.00 | Per Kg |
| 5 | Replacement of defective compressor by company repaired compressor as per OEM recommendations of following gadgets including testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor.1.0 TR A.C. | 5.00 | Each |
9 Days Left