Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID4789703
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Certain Repair To Lt Distribution System Alongwith Allied Works At Domestic Area And Tech Area At Bhisiana Under Ge (af) Bhisiana
Last Date For Submission3rd Aug, 2026
Opening Date05 Aug, 2026
Cost
Document Cost500.00
EMD96000.00
Estimated Cost4800000.00
Location
CityBhisiana
StatePunjab

Register to see full details

BOQ Items
#ItemQtyUnits
1Excavation in trenches (Manual), not exceeding 1.5m wide and not exceeding 1.5m in depth for pipe line, cable in trenches etc., not exceeding 10 Sqm on plan and getting out in any type of soft including trimming the sides and forming bottom surfaces to required levels complete all as specified and as directed.1090.00Cum
2Excavation in trenches (Manual), not exceeding 1.5m wide and exceeding 1.5m but not exceeding 3m in depth for pipe line, cable in trenches, for pole etc., not exceeding 10 Sqm on plan and getting out in any type of soft including trimming the sides and forming bottom surfaces to required levels complete all as specified and as directed.0.50Cum
3Returning, filling including spreading, leveling watering and well ramming in layers not exceeding 25cm thick in soft/loose soil complete all as specified and as directed.1000.00Cum
4Removing excavated material (surplus soil) to a distance not exceeding 50 m and depositing where directed at a level not exceeding 1.5 metre above the starting point complete all as specified and as directed.90.00Cum
5Material and labour for boring of holes (trenchless horizontal Directional Drilling) under road pavement, hard standing or any other situation by using trenchless boring manual manpower by using manpower auger machine/spiral-bladed drill /Boki/mechanically or any other means suitable for accommodate/inserting pipe upto 100mm bore in the drilled holes, including excavation, returning filling in the both ends working space including removal of surplus soil and making good the surface complete all as specified and as directed. Note ; (i) Only length of the road/hard standing/Pavement will be measured for payment and cost for excavation, returning filling and making good at both side of bore shall deemed to be included in the quoted unit rate nothing extra shall be paid on this account. (ii) Pipe shall be measured and paid separately)120.00RM
3rd Aug, 2026

19 Days Left

WhatsApp