Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3755567 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Upgradation Of Sewage Lines At Certain Md Accn Area Under Ge (af) Bhisiana |
| Last Date For Submission | 16th Apr, 2026 |
| Opening Date | 18 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 48480.00 |
| Estimated Cost | 2420000.00 |
| City | Bhisiana |
|---|---|
| State | Punjab |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in trenches (Manual), not exceeding 1.5m wide and not exceeding 1.5m in depth for foundations of shafts, wells, cess pits, manholes, pipe line, cable in trenches etc., not exceeding 10 Sqm on plan and getting out in any type of soft including trimming the sides and forming bottom surfaces to required levels complete all as specified and as directed. | 322.00 | Cum |
| 2 | Excavation in trenches (Manual), not exceeding 1.5m wide and exceeding 1.5m but not exceeding 3m in depth for foundations of shafts, wells, cess pits, manholes, pipe line, cable in trenches etc., not exceeding 10 Sqm on plan and getting out in any type of soft including trimming the sides and forming bottom surfaces to required levels complete all as specified and as directed. | 540.00 | Cum |
| 3 | Returning, filling including spreading, leveling watering and well ramming in layers not exceeding 25cm thick in soft/loose soil complete all as specified and as directed. | 837.00 | Cum |
| 4 | Removing excavated material (surplus soil) to a distance not exceeding 50 m and depositing where directed at a level not exceeding 1.5 metre above the starting point complete all as specified and as directed. | 25.00 | Cum |
| 5 | Demolition and breaking up drain pipes up to and including 200 mm bore (ID) Salt glazed ware (SGSW), AC or Reinforced concrete pipe set in any type of cement mortar including bed, including removing debries/rubbish material from site to outside MOD land complete all as specified and as directed. | 1170.00 | RM |
6 Days Left