Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Rajasthan State Industrial Development And Investment Corporation
Tender ID3705492
Organisation NameRajasthan State Industrial Development And Investment Corporation
Tender BriefCorrigendum : Covering Of Drains At Industrial Area Kaharani
Last Date For Submission14th Apr, 2026
Opening Date15 Apr, 2026
Cost
Document Cost5900.00
EMD3565956.00
Estimated Cost178297823.00
Location
CityBhiwadi
StateRajasthan

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil2680.5Cum
2Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level., 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).1072.2Cum
3Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786), Cold twisted deformed bars (IS : 1786).669207.38Kg.
4Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix7021.92Cum
5Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc.28949.4Sqm.
14th Apr, 2026

7 Days Left

WhatsApp