Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3705492 |
|---|---|
| Organisation Name | Rajasthan State Industrial Development And Investment Corporation |
| Tender Brief | Corrigendum : Covering Of Drains At Industrial Area Kaharani |
| Last Date For Submission | 14th Apr, 2026 |
| Opening Date | 15 Apr, 2026 |
| Document Cost | 5900.00 |
|---|---|
| EMD | 3565956.00 |
| Estimated Cost | 178297823.00 |
| City | Bhiwadi |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil | 2680.5 | Cum |
| 2 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level., 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 1072.2 | Cum |
| 3 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786), Cold twisted deformed bars (IS : 1786). | 669207.38 | Kg. |
| 4 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix | 7021.92 | Cum |
| 5 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. | 28949.4 | Sqm. |
7 Days Left