Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4610041 |
|---|---|
| Organisation Name | Public Health Engineering Department |
| Tender Brief | Corrigendum : Reconstruction Of Damaged Manhole Chamber I/c De Silting And Cleaning Of Manholes And Sewer Line At Khushboo Park Under Sub Division No.06, Bhopal |
| Last Date For Submission | 6th Jul, 2026 |
| Opening Date | 08 Jul, 2026 |
| Document Cost | 2000.00 |
|---|---|
| EMD | 15313.00 |
| Estimated Cost | 0.00 |
| City | Bhopal |
|---|---|
| State | Madhya Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Reconstruction of damaged manhole chamber i/c de silting and cleaning of manholes and sewer line at Khushboo Park under Sub division No.06, Bhopal | ||
| 2 | Earth work in excavation for foundation, trenches for pipes/ cables, drains or in well excavation etc. by mechanical means/ manual means (exceeding 30cm in depth.) including ramming of bottom, dressing of sides disposal of excavated earth including of all lift and lead upto 50m.Disposed earth to be levelled and neatly dressed. Ordinary rock or soft rock with or without blasting (It. No. 15.6.3 P.No. 257 ) 20x1.60x1.60x0.25 = 12.80 + 05x0.785x2.10x2.10x0.25 =4.33Total 17.13 cum | 17.13 | cum |
| 3 | Earth work in excavation for foundation, trenches for pipes/ cables, drains or in well excavation etc. by mechanical means/ manual means (exceeding 30cm in depth.) including ramming of bottom, dressing of sides disposal of excavated earth including of all lift and lead upto 50m. Disposed earth to be levelled and neatly dressed. All kinds of soil. (It. No. 15.6.1 P.No. 257 ) 20x{(1.60x1.60x0.60)-(0.785x0.85 x0.60)}= 23.91 05x[(2.10x2.10x1.65)-(0.785x0.85 x1.65)}=31.70 Total 55.61 cum | 55.61 | cum |
| 4 | Demolishing Brick work in lime or cement mortar in any mix including stacking of serviceable material and disposal of unserviceable material with in 50 meter lead as per direction of engineer-in-charge. ( In cement mortar ) ( It. No. 15.15 P.No. 258 ) 20x0.785x[((1.60+1.10)/2) -((1.20+0.70)/2) ]x0.60= 8.67 | 8.67 | cum |
| 5 | Brick work with well burnt chimney bricks having crushing strength not less than 25 kg/cm and water absorption not more than 20 % in foundation & plinth i/c curing etc. complete. (ii) in cement mortar 1:4 ( It. No. 15.40.2 P.No. 262 ) 20x0.785x[((1.60+1.10)/2) -((1.20+0.70)/2) ]x1.00= 14.44 | 14.44 | cum |
6 Days Left