Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID3781537
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Special Repair Of Road/hardstanding Of Old Mt Of 21 Corps Grid Sig Regt (aren) At Bairagarh Bhopal Under Ge Bhopal
Last Date For Submission14th Apr, 2026
Opening Date16 Apr, 2026
Cost
Document Cost500.00
EMD93460.00
Estimated Cost4673000.00
Location
CityBhopal
StateMadhya Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Scarifying or picking gravelled macadam or bitumen macadam surfaces in area n . exc.400 sqm , depth n.exc 50mm deep complete all as specified and as directed.437.4010 Sqm
2Scarifying or picking gravelled macadam or bitumen macadam surfaces in area n . exc.400 sqm , depth exc 50 mm and not exc 100 mm deep complete all as specified and as directed.21.6010 Sqm
3Laying and compacting 75 mm thick (compacted thickness) Wet Mix Macadam (WMM) grading as pe table 400-13 of MaRTH specifications for Road and Bridge works 2013 manufactured in WMM plant material comprising of clean, crushed, graded aggregate and granular material premixed with wate to a dense mass, spreading with sensor paver and rolling with vibratory roller of capacity 80-1 OOKN static weight and consolidating to required gradien and camber complete all as specified and directed The finished surface tolerances to be as per Table 900-1 of MaRTH specifications for Road and Bridge works 2013 complete all as specified and as directed.10.8010 Sqm
4Laying and compacting 150 mm thick (compacted thickness) Wet Mix Macadam (WMM) in two layers 75mm each grading as pe table 400-13 of MaRTH specifications for Road and Bridge works 2013 manufactured in WMM plant material comprising of clean, crushed, graded aggregate and granular material premixed with wate to a dense mass, spreading with sensor paver and rolling with vibratory roller of capacity 80-1 OOKN static weight and consolidating to required gradien and camber complete all as specified and directed The finished surface tolerances to be as per Table 900-1 of MaRTH specifications for Road and Bridge works 2013 complete all as specified and as directed.10.8010 Sqm
5M & L for Preparing surfaces by brushing with wire brushes for removing caked mud etc. swe eping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc and Applying evenly a priming/tack coat with bituminous primer at 10 kg per 10 sq metre complete all as specified and as directed.21.6010 Sqm