Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4123485 |
|---|---|
| Organisation Name | Public Health Engineering Department |
| Tender Brief | Reconstruction Of Fully Damaged Manhole Chamber I/c De Silting And Cleaning Of Manholes And Sewer Line Constructed At Sajida Nagar Sewage Network Under Sub Div. 6, Bhopal |
| Last Date For Submission | 12th May, 2026 |
| Opening Date | 14 May, 2026 |
| Document Cost | 2000.00 |
|---|---|
| EMD | 10144.00 |
| Estimated Cost | 0.00 |
| City | Bhopal |
|---|---|
| State | Madhya Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Reconstruction of fully damaged manhole chamber i/c de silting and cleaning of manholes and sewer line constructed at Sajida Nagar Sewage Network under Sub Div. 6, Bhopal | ||
| 2 | Earth work in excavation for foundation, trenchesfor pipes/ cables, drains or in well excavation etc.by mechanical means/ manual means (exceeding 30cm in depth.) including ramming of bottom, dressing of sides disposal of excavated earth including of all lift and lead upto 50m. Disposed earth to be levelled and neatly dressed. (15.6.3) Ordinary rock or soft rock with or without blasting ( PHE USOR wef. 01.09.2023 It. No. 15.6.3 P.No. 257) 10x1.20x1.20x0.25 = 3.6 20x1.20x1.05x0.25 = 6.3 total 9.9 cum | 9.90 | cum |
| 3 | Earth work in excavation for foundation, in building works etc. by mechanical means/ manual means (exceeding 30cm in depth.) including ramming of bottom, dressing of sides disposal of excavated earth including of all lift and lead upto 50m. Disposed earth to be levelled and neatly dressed. All kind of soil ( PHE USOR wef. 01.09.2023 It. No. 15.6.1 P.No. 257 ) 10{(1.20x1.20x1.00)-(1.00x1.00x0.90)}= 5.4 20x{(1.20x1.05x0.70)-(1.00x0.85x0.60)]=7.44 Total 12.84 Cum | 12.84 | cum |
| 4 | Dismantling of manhole including R.C.C./C.C. top slab, CI / pre cast RCC cover with frame including stacking of useful materials near the site and disposal of unserviceable materials into municipal dumps within 50 m lead. Manholes size 60x60 and 90 cm deep. ( PHE USOR wef.01-09-2023 It. No. 29.18.5 P.No.376) | 10 | No. |
| 5 | Manholes size 60x45 and 60 cm deep. ( PHE USOR wef.01-09-2023 It. No. 29.18.4 P.No.376 ) | 20 | No. |
13 Days Left