| Tender ID | 4123504 |
|---|---|
| Organisation Name | Public Health Engineering Department |
| Tender Brief | Repairing And Reconstruction Of Damaged Manhole Chambers Including Cleaning Of Manholes And Sewer Line Of Ekant Park Oxidation Pond, Bhopal |
| Last Date For Submission | 12th May, 2026 |
| Opening Date | 14 May, 2026 |
| Document Cost | 2000.00 |
|---|---|
| EMD | 10518.00 |
| Estimated Cost | 0.00 |
| City | Bhopal |
|---|---|
| State | Madhya Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Repairing and reconstruction of damaged manhole chambers including Cleaning of manholes and sewer line of Ekant Park Oxidation Pond, Bhopal | ||
| 2 | (PHE USOR wef 01.09.2023 it No. 15.6.1 Page No. 257) Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be leveled and neatly dressed. All kind of soil 8x{(2.5x2.1x0.50)-(1.66x1.36x0.50)} =11.96 cum | 11.96 | Cum |
| 3 | (PHE USOR wef 01.09.2023 it No. 29.22 Page No. 376) Pumping out to remove the sewers blockages by using suitable pump sets operated by generators , whole assembly mounted on two/four wheels trailer /pickup van. Including diesel & labour charges etc. | 24 | Per Hours |
| 4 | (PHE USOR wef 01.09.2023 it No. 15.18.1 Page No. 259) Demolishing cement concrete manually / by mechanical means including disposal of material within 50 m lead as per direction of engineer-in- charge. Nominal concrete 1:3:6 or richer mix ( i/c equivalent design mix ) 8x[ ( 1.70 x 1.40 x 0.15) - ( 0.785 x 0.56 x0.56 x 0.15 ) ] = 2.56 cum 8x1.20x0.75x0.10=0.72um | 3.28 | Cum |
| 5 | (PHE USOR wef 01.09.2023 it No. 15.15 Page No. 258) Demolishing Brick work in lime or cement mortar in any mix including stacking of serviceable material and disposal of unserviceable material with in 50 meter lead as per direction of engineer-in-charge. (In cement mortar) 8x[(1.66x1.36x0.30)-(1.20x0.90x0.30)]=2.82 cum | 2.82 | Cum |