| Tender ID | 3888069 |
|---|---|
| Organisation Name | Odisha Industrial Infrastructure Development Corporation |
| Tender Brief | Construction Of Sfrc Pre Cast, Pretensioned Compound Wall For Paradeep Petrochemical Complex At Fatehpur And Pratappur Under Kujanga Tahasil Of Jagatsinghpur. |
| Last Date For Submission | 15th Apr, 2026 |
| Opening Date | 16 Apr, 2026 |
| Document Cost | 11800.00 |
|---|---|
| EMD | 942853.00 |
| Estimated Cost | 94285355.00 |
| City | Bhubaneswar |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in ordinary soil in embankments, roads etc. within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth and as per specification approved by the Deptt. along with proper compaction with PRR including hire & running charges of PRR, all labour, T&P, sundries etc all complete as directed by the Engineer-in-Charge. | 3660.250 | cum |
| 2 | Filling foundation with excavated material and compacted and top surface dressed and levelled to proper level & slope as per direction of the Engineer in charge including cost of all labour sundries T&P etc complete as directed by the Engineer-in-Charge. | 2440.170 | cum |
| 3 | Construction and boring 300 mm dia single under reamed pile foundation in cement concrete of M-25 grade using 20mm & down grade crusher broken hard granite chips of approved quality,etc complete as directed by the Engineer-in-Charge. | 10914.000 | Mtr. |
| 4 | Providing, mixing, lifting, hosting and laying reinforced cement concrete of M-25 grade confirming the minimum compressive strength of 250kg/cm2 on work test (test conducted in accordance with IS : 456 & IS : 516) of 15 cm cube at 28 days to base of columns and footing, fins, roof slabs, etc. complete including cost, conveyance, loading, unloading, royalties of all materials and cost of all labours, T&P, required for the work etc. complete in all respect as per the direction of the Engineer-in-Cgharge but excluding cost and conveyance of M.S. rods or Tor steel. | 1214.860 | cum |
| 5 | Cutting, Straightening coiled or bent up HYSD / TMT Reinforcement Bars welding or jointing if necessary, bending, binding, tying the grills as required for R.C.C. works, hoisting, lowering and placing the same in proper position according to the approved designs and drawings including cost, coveyance, loading, unloading ,stacking & taxes of HYSD/ TMT Reinforcement Bars and Binding Wires of 18 to 20 Gauge as required for the work , cost of all Labour T&P as directed by Engineer-in-charge. | 2090.687 | Qntl. |