Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4354543 |
|---|---|
| Organisation Name | Indian Oil Corporation Limited |
| Tender Brief | Corrigendum : Annual Rate Contract For Upkeep And Maintenance Of Firefighting Facilities At Serpl, Ppl Paradip Station |
| Last Date For Submission | 10th Jun, 2026 |
| Opening Date | 11 Jun, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 7000.00 |
| Estimated Cost | 0.00 |
| City | Bhubaneswar |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | GST % for the tender Please select the rate of GST in cell W13. Rate selected shall be applicable for the entire BoQ. | ||
| 2 | PRRPL Fixed Part-Not to be quoted | ||
| 3 | Assistance in regular Maintaining/ upkeepment of firefighting equipments (DCP, CO2, CA portable extinguishers, Foam monitors, hydran t valves, hoses, nozzles) including CO2 flooding system, MVWS, Heat Detectors, Smoke Detectors and HCDs, Painting work, etc., any ot her jobs as directed by EIC by providing 2 semi skilled labourers on a daily basis. The work includes assistance to IOCL technician in routine operation/maintenance including cleaning/opening/closing/repair/greasing etc., complete in all respect as per advice/inst ruction of EIC/site engineer, but without supply of tools/tackles and consumables. Work to be done by 1 semi skilled + 1 un skilled labour per day (26 days/month). Total days for 1 semi skilled person for 2 years = 624 days. | 156 | DAY |
| 4 | Assistance in regular Maintaining/ upkeepment of firefighting equipments (DCP, CO2, CA portable extinguishers, Foam monitors, hydrant valves, hoses, nozzles) including CO2 flooding system, MVWS, Heat Detectors, Smoke Detectors and HCDs, Painting work, etc., any other jobs as directed by EIC by providing 2 semi?skilled labourers on a daily basis. The work includes assistance to IOCL technician in routine operation/maintenance including cleaning/opening/closing/repair/greasing etc., complete in all respect as per advice/instruction of EIC/site engineer, but without supply of tools/tackles and consumables. Work to be done by 1 semi?skilled + 1 un?skilled labour per day (26 days/month). Total days for 1 unskilled person for 2 years = 624 days | 156 | DAY |
| 5 | MOS Allowances: Canteen Allowance @30 per attendance, Washing Allowance @30 per attendance, Transport Allowance @28 per attendance, Allowance for children education @20 per attendance, Dependent Health Allowance @20 per attendance. | 312 | DAY |
5 Days Left