Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3933963 |
|---|---|
| Organisation Name | Water Corporation Of Odisha |
| Tender Brief | Corrigendum : Design, Drawing, Construction, Testing And Commissioning Of Sewerage System, 65 Kld Effluent Treatment Plant (etp) Inside District Head Quarter Hospital In Sundargarh Including Operation And Maintenance For A Period Of Five Years |
| Last Date For Submission | 29th Apr, 2026 |
| Opening Date | 02 May, 2026 |
| Document Cost | 11800.00 |
|---|---|
| EMD | 215000.00 |
| Estimated Cost | 21503000.00 |
| City | Bhubaneswar |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking into pieces not exceeding 0.02 cum in volume, and stacking serviceable materials at designated locations and disposing of dismantled materials up to a lead of 1000 metres, including stacking serviceable and unserviceable materials separately, complete as per the direction of the Engineer-in-Charge. | 236.84 | Cum |
| 2 | Earthwork excavation in all kind of soil and hard rock / laterite rock. For laying of waste water pipe line (PVC SWR (Type-B) Pipe) Supplying all labours and T&P for earth work in all kind of soil within 50mtr inttial lead including rough dressing and breaking of clods maximum 5cmto 7cm size and laying in layers not exceeding 0.30mtr in depth as per direction of Engineer -in -charge. Upto 1.50 mtr. Depth | 532.50 | Cum |
| 3 | For laying of Waste water pipe line from Inspection chamber to manhole chamber (DWC Pipe) Supplying all labours and T&P for earth work in all kind of soil within 50mtr inttial lead including rough dressing and breaking of clods maximum 5cmto 7cm size and laying in layers not exceeding 0.30mtr in depth as per direction of Engineer -in -charge. Upto 1.50 mtr. Depth | 508.87 | Cum |
| 4 | Beyond 1.50 - 3.00 mtr. Depth | 92.87 | Cum |
| 5 | Excavation of foundation in laterite rock or any hard rock (other than granite )removed by chiselling including dressing and leveling the bed not exceeding 1.5mtr depth and depositing the soil within 50mtr initial lead as per specification approved by the Deptt. Beyond 1.50 - 3.00 mtr. Depth | 45.49 | Cum |
5 Days Left