Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4924533 |
|---|---|
| Organisation Name | All India Institute Of Medical Sciences |
| Tender Brief | Corrigendum : Provision Of Wall Tiles And Replacement Of Damaged Gypsum Board Ceiling Of Auditorium At Aiims, Bhubaneswar. |
| Last Date For Submission | 27th Jul, 2026 |
| Opening Date | 28 Jul, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 4490.00 |
| Estimated Cost | 224075.00 |
| City | Bhubaneswar |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Providing and laying Double charge vitrified tile polished finish in floor/wall with different sizes (thickness to be specified by the manufacturer), with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 6 mm thickness, including grouting of joints. Size of Tile 600x600 mm | 62.70 | Sqm |
| 2 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 62.70 | Sqm |
| 3 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) | 62.70 | Sqm |
| 4 | Providing and fixing 12.5mm thick gypsum plaster board conforming to IS 2095:2011 fixed on existing GI support sections from the ceiling as well as for the vertical faces by using self-drilling / taping screws / fasteners @ 60cm c/c of approved make. The cost including fixing of any additional GI furring 80mm channel as main runners and 60mm channel as intermediate runners, GI L angles for vetical supports,dash fastener, GI cleats, Hanger rods and Screws , minor repairing of existing frames all if required in respective location, all other scaffolding charges, smooth finishing as directed the Engineering in charge | 100.00 | Sqm |
| 5 | Removal/Cutting of damaged gypsum boards from the false ceiling without damaging the existing GI Support frame work disposal of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer-in-charge | 86.61 | Sqm |
5 Days Left