| Tender ID | 3997758 |
|---|---|
| Organisation Name | Water Corporation Of Odisha |
| Tender Brief | Design, Drawing, Construction Testing And Comm. Of S/s, 140 Kld Sewage Treatment Plant (stp) And 35 Kld Effluent Treatment Plant (etp) For Sub-division Head Quarter Hospital In Anandapur, Keonjhar Including Operation And Maint. For A Period Of Five Years |
| Last Date For Submission | 28th Apr, 2026 |
| Opening Date | 30 Apr, 2026 |
| Document Cost | 11800.00 |
|---|---|
| EMD | 358000.00 |
| Estimated Cost | 35788000.00 |
| City | Bhubaneswar |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking into pieces not exceeding 0.02 cum in volume, and stacking serviceable materials at designated locations and disposing of dismantled materials up to a lead of 1000 metres, including stacking serviceable and unserviceable materials separately, complete as per the direction of the Engineer-in-Charge. | 101.76 | Cum |
| 2 | Cutting asphalt / bituminous road of flexible pavement, dismantling materials up to a lead of 1000 metres, stacking serviceable materials separately and disposing of unserviceable materials, including cost of all labour, tools & plants (T&P), etc., complete as per the direction of the Engineer-in-Charge. | 32.04 | Cum |
| 3 | Dismantling of cement concrete paver block flooring/pavement, including removal of paver blocks and bedding layer, sorting and stacking of serviceable materials, disposal of rubbish within specified lead, as directed by Engineer-in-Charge. | 314.40 | Sqm |
| 4 | Earthwork excavation in all kind of soil and hard rock / laterite rock. For laying of waste water pipe line (SWR (Type-B) Pipe) Supplying all labours and T&P for earth work in all kind of soil within 50mtr inttial lead including rough dressing and breaking of clods maximum 5cmto 7cm size and laying in layers not exceeding 0.30mtr in depth as per direction of Engineer -in -charge. Upto 1.50 mtr. Depth | 63.00 | Cum |
| 5 | Excavation of foundation in laterite rock or any hard rock (other than granite) removed by chiselling including dressing and leveling the bed not exceeding 1.5mtr depth and depositing the soil within 50mtr initial lead as per specification approved by the Deptt. Upto 1.50 mtr. Depth | 18.00 | Cum |