| Tender ID | 4376367 |
|---|---|
| Organisation Name | Water Corporation Of Odisha |
| Tender Brief | Laying Of 200mm Dia Di Loading Main Pipe Line From Sai Temple To Sameigadia Old Pump House In Ward No-05,bmc, Under Watco Section Ggp Colony, Bbsr |
| Last Date For Submission | 5th Jun, 2026 |
| Opening Date | 06 Jun, 2026 |
| Document Cost | 7080.00 |
|---|---|
| EMD | 29000.00 |
| Estimated Cost | 2841000.00 |
| City | Bhubaneswar |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Supplying all materials, labour and T&P for Earth work excavation in foundation and trenches in all kind of soil , laying servicable and unservicable material in layers not exceeding 0.3m in depth etc. all complete as per specification and direction of the Engineer-in-charge. | 93.60 | Cum |
| 2 | Supplying all labour, T&P and earth work in excavation in stoney earth and gravel mixed with stone boulders not exceeding 0.014 cum in volume within 50M initial lead and 1.5M initial lift, in foundation as per the direction of the Engineer-in-charge. | 234.00 | Cum |
| 3 | Cutting in disintegrated rock not requiring blasting to be removed by pick axes and crow bars and depositing materials within 50m initial lead and 1.5m initial lift including rough dressing as per direction and specification of the department including stacking the useful materials separately as ordered etc as per direction of Engineer - in - Charge. | 140.40 | Cum |
| 4 | Cutting asphalt or bituminous road of flexible pavments and disposal of dismantalled materials up a lead of 1000 mtr stacking servicable and unservicable materials separately including cost of all labour, T & P etc. all complete as per the direction of | 121.20 | cum |
| 5 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately | 2.70 | cum |