Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4858443 |
|---|---|
| Organisation Name | Water Corporation Of Odisha |
| Tender Brief | Provision For Construction Of Ugr, Positive Suction Pump House, Installation Of Pumping Machineries Including Laying Of Feeder Main And Distribution Main For Water Supply Arrangement To Obc And Minority Hostel At Gothapatana, Bhubaneswar |
| Last Date For Submission | 21st Jul, 2026 |
| Opening Date | 23 Jul, 2026 |
| Document Cost | 11800.00 |
|---|---|
| EMD | 130000.00 |
| Estimated Cost | 12946000.00 |
| City | Bhubaneswar |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Designing, construction, testing and commissioning of R.C.C 1.50 Lakh Ltr Capacity OGR/UGR including cost of all material, labour, T & P with taxes, transportation provision of all other accessories like suction pipe , delivery pipe,scour pipe , water level indicator , lighting arrestor/ ladder (inside& outside), M.H cover, over flow pipe, ventilator etc all complete as per the P.H specification and the direction of Engineer-in-charge. | 150000 | Ltr |
| 2 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 900.0 | Sqm |
| 3 | Provision for levelling & dressing of proposed site for construction of OGR/UGR, Compound Wall & positive suction Pump House by using Dozer D-50 -A 15 including hire charges of macinaries etc complete. | 10.0 | Hour |
| 4 | Cutting asphalt or bituminous road of flexible pavments and disposal of dismantalled materials up a lead of 1000 mtr stacking servicable and unservicable materials separately including cost of all labour, T & P etc. all complete as per the direction of engineer-in-charge. | ||
| 5 | Laying of 200mm dia DI W/S Pipe Line - | 5.40 | Cum |
14 Days Left