Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4448189 |
|---|---|
| Organisation Name | Odisha Mining Corporation Limited |
| Tender Brief | Provision Of Barbed Wire Fencing From Boundary Pillar No M To E (south And East Side) Of Tiringpahar Mines Of Barbil Region In The District Of Keonjhar. |
| Last Date For Submission | 16th Jun, 2026 |
| Opening Date | 17 Jun, 2026 |
| Document Cost | 7080.00 |
|---|---|
| EMD | 13600.00 |
| Estimated Cost | 1360000.00 |
| City | Bhubaneswar |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Civil works | ||
| 2 | Clearing & grubbing road land including uprooting rank vegetation, grass, bushes, shurbes,sapling and trees girth upto 300mm removal of stumps of trees cut earier and disposal of unsevicable materials and stacking of servicable materials to be used up to lead of 1000 meters including removal and disposal of top organic soil not exceeding 150mm thickness and as per direction of EIC. | 6800.00 | Sqm |
| 3 | Earth work in excavation of foundation trenches in all kinds of soil including moorum, stony earth and earth mixed with boulders (except sheet rocks and boulders requiring for blasting) including dressing and leveling the bed up to the required depth and depositing the excavated materials at places away from the work site with all leads and lifts, T&P shoring and shuttering and dewatering if required etc. comp. as directed by EIC. | 27.30 | Cum |
| 4 | Excavation of foundation in laterite rock or any hard rock (other than granite or disintegrated rock) removed by chiseling including dressing and leveling the bed not exceeding 1.5m in depth and depositing the soil within initial lead of 50m and as per specification approved by the Department & as per direction of Engineer-in-charge. | 27.30 | Cum |
| 5 | PCC M-15 grade concrete in foundation and plinth with 20mm down graded hard crusher broken granite chips including lowering,laying concrete to required levels, watering and curing finishing the exposed surfaces smooth including cost, conveyance, royalities of all materials,cost of all labour,T & P required for the work etc.required to complete as per direction of EIC. In foundation | 49.40 | Cum |
16 Days Left