Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3999595 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Construction Of Culvert For Diverting Monsoon Water Entering Market Area Near V.p. Pale-kothambi In Sankhali Constituency Of Bicholim Taluka. |
| Last Date For Submission | 22nd Apr, 2026 |
| Opening Date | 24 Apr, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 212645.00 |
| Estimated Cost | 10632192.00 |
| City | Bicholim |
|---|---|
| State | Goa |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete wood work, steel work, including T & P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metresas per MORTH 202 XIII)Removing all types of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works as per MORTH specification202 Above 600 mm to 900 mm dia | 10.00 | cum |
| 2 | Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead 50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.as per MORTH Specification 301 | 1017.00 | cum |
| 3 | Earthwork in excavation of foundation of structures of culverts,abntments piers, retaining walls etc. as per drawing and technical specification, including setting out construction of shoring and bracing removal of stumps and other deleterious matter, dressing of sides and bottom, back filling the excavation earth to the extent required and utilising the remaning earth locally for road work upto 3.00 m depth as per MORTH Specification 304 EXCLUDING DEWATERING Ordinary soil Mechanical Means | 951.00 | cum |
| 4 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 149.00 | cum |
| 5 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : a)All works upto plinth level | 841.00 | cum |
8 Days Left