Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID4143310
Organisation NamePublic Works Department
Tender BriefCorrigendum : Construction Of Protection Wall At Ch.0.225kms On Lhs Of Road No.tm 48a In V.p Chodan Madel In Mayem Constituency Of Tiswadi Taluka
Last Date For Submission18th May, 2026
Opening Date20 May, 2026
Cost
Document Cost5000.00
EMD40265.00
Estimated Cost2013234.00
Location
CityBicholim
StateGoa

Register to see full details

BOQ Items
#ItemQtyUnits
1Earthwork in excavation of foundation of structures of culverts,abntments piers, retaining walls etc. as per drawing and technical specification, including setting out construction of shoring and bracing removal of stumps and other deleterious matter, dressing of sides and bottom, back filling the excavation earth to the extent required and utilising the remaning earth locally for road work upto 3.00 m depth as per MORTH Specification 304 EXCLUDING DEWATERING Ordinary soil Manual Means 171.00Cum
2Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.23.00Cum
3Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing :; a)All works upto plinth level196.00Cum
4Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing :; b)In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level.43.00Cum
5Centering & shuttering including Strutting, Propping & removal of forms for :;Foundations, Footings, Bases for columns242.00Sqm
18th May, 2026

13 Days Left

WhatsApp