Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4143310 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Construction Of Protection Wall At Ch.0.225kms On Lhs Of Road No.tm 48a In V.p Chodan Madel In Mayem Constituency Of Tiswadi Taluka |
| Last Date For Submission | 18th May, 2026 |
| Opening Date | 20 May, 2026 |
| Document Cost | 5000.00 |
|---|---|
| EMD | 40265.00 |
| Estimated Cost | 2013234.00 |
| City | Bicholim |
|---|---|
| State | Goa |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earthwork in excavation of foundation of structures of culverts,abntments piers, retaining walls etc. as per drawing and technical specification, including setting out construction of shoring and bracing removal of stumps and other deleterious matter, dressing of sides and bottom, back filling the excavation earth to the extent required and utilising the remaning earth locally for road work upto 3.00 m depth as per MORTH Specification 304 EXCLUDING DEWATERING Ordinary soil Manual Means | 171.00 | Cum |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 23.00 | Cum |
| 3 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing :; a)All works upto plinth level | 196.00 | Cum |
| 4 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing :; b)In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level. | 43.00 | Cum |
| 5 | Centering & shuttering including Strutting, Propping & removal of forms for :;Foundations, Footings, Bases for columns | 242.00 | Sqm |
13 Days Left