Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3942783 |
|---|---|
| Organisation Name | Water Resources Department |
| Tender Brief | Corrigendum : Improvement Of Nallah By Constructing Of Protection Wall To The Field Bearing Sy. No. 3/5 At Village Zarme V.p. Mauxi In Sattari Taluka. |
| Last Date For Submission | 23rd Apr, 2026 |
| Opening Date | 24 Apr, 2026 |
| Document Cost | 3000.00 |
|---|---|
| EMD | 15729.00 |
| Estimated Cost | 786468.00 |
| City | Bicholim |
|---|---|
| State | Goa |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means/ manual means in all types of strata comprising any of materials such as soil, silt clay gravel morrum of all varities shingles, pebbles all types of laterite tock soft rock, ordinary rock, dissintegrated rock, fissured, shattered/decomposed materials either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted incl.of chiselling wedging etc in all condition such dry. as moist, saturated submerged foul conditions etc. including pumping or bailing out water shoring and strutting providing barricading. danger lighting, gaurding and back filling the excavation earth to the extent required and disposal of excavated stuff in specified area lead upto 50m & with all lifts etc. complete and as per specification and drawing and as directed by the Engineer-incharge etc. all complete.irected within a lead of 50 m | 85.40 | Cum |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. In pipeline treanches and other foundations complete. | 9.40 | Cum |
| 3 | Centering and shuttering including struttings, propping etc. and removal of formwork for: a). Foundations, footings, bases for columns and mass concrete. | 179.40 | Sqm |
| 4 | Providing & laying cement concrete 1:2:4(1 cement: 2 coarse sand:4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in a) All works upto plinth level | 79.60 | Cum |
| 5 | Providing and fixing weepholes with rigid PVC make laid in Position with a required slope and level while laying pipes of approved the concrete of retaining wall wing wall and earth retaining structure complete as directed by the engineer in charge. B) 75 mm Dia | 31.20 | rm |