Tendering Authority: Public Works Department
Tender ID4080516
Organisation NamePublic Works Department
Tender BriefStrengthening Of Alternate Road For A Length Of 1.10kms And Restoration Of Compound Wall Along The Mdr 21 (65771) To Widen The Side Shoulder For A Length Of 0.40kms At Sirgao In Mayem Constituency Of Bicholim Taluka.
Last Date For Submission27th Apr, 2026
Opening Date29 Apr, 2026
Cost
Document Cost6000.00
EMD79395.00
Estimated Cost3969723.00
Location
CityBicholim
StateGoa

Register to see full details

BOQ Items
#ItemQtyUnits
1Clearing jungle including up rooting of rank vegetation grass bush wood trees and sapling of girth upto 30 cm. measured at a height of 1 m above ground level & removal of rubbish upto a distance of 50 mt. outside the periphery of the area cleared. (if however, only grass is met with the area will be measured and paid for under item 4001).7400.00sqm
2Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead 50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.as per MORTH Specification 301412.50Cum
3Spreading the earth/hard soil in layers not exceeding 250 mm in depth breaking clods, watering rolling each layer with half ton roller or wooden or steel hammers and rolling every third and topmost layer with power toller of minimum 8 tonne and dressing up in embankment for roads, flood banks, marginal and guide banks and filling up of ground dressing etc. complete.3135.00Cum
4Road Delineators (Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide stripes, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and confirming to IRC-79 and the drawings.)420.00Each
5Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m; All kinds of soil270.64Cum