Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID4494762
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Runway Rehabilitation Scheme And Repair Maint Of Mansoon Drain, Dtgm And Sign Boards, Filling Of Ditches On Shoulders, Levelling, Clearance Of Grass Using Jcb, Jungle Jim Etc At Af Stn Bihta
Last Date For Submission30th Jun, 2026
Opening Date06 Jul, 2026
Cost
Document Cost500.00
EMD66000.00
Estimated Cost3300000.00
Location
CityBIHTA
StateBihar

Register to see full details

BOQ Items
#ItemQtyUnits
1Surface excavation n.exc (not exceeding) 30cm deep and averaging 15cm deep and cleaning away all grass, vegitation, sapling, shrub, brushwood, undergrowth & removing rubish upto a distance of 50m outside the peripheri pf the area under clearance complete, all as specified.2000.00Square Metre
2Earth work in excavation by mechanical means (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 Sq.m on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, complete all as specified.11.50Cubic Metre
3Forming embankments including raising (or lowering) earth, spreading in layers n exc 30 cm thick & height not exceeding 1.5 metre high from base watering, ramming to obtain optimum moisture condition to the specified percentage of standard proctor density not less than 95 percent and finishing to required size & shape as directed by Engineer-in-Charge. NOTES: - (i) Removing boulders / lumps of size 75mm and above by screening the soil before filling in traverse.10.00Cubic Metre
4Forming embankments including raising (or lowering) earth, spreading in layers n exc 30 cm thick & height exceeding 1.5 metre but n. exc 3.00 metre high from base watering, ramming to obtain optimum moisture condition to the specified percentage of standard proctor density not less than 95 percent and finishing to required size & shape as directed by Engineer-in-Charge. NOTES: - (i) Removing boulders / lumps of size 75mm and above by screening the soil before filling in traverse.1.50Cubic Metre
5PCC type C-2 (1:3:6), using 40 mm graded stone aggregates as in surface channels and drains, complete all as specified.50.00Cubic Metre
30th Jun, 2026

6 Days Left

WhatsApp