Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Central Mine Planning And Design Institute Limited
Tender ID4115411
Organisation NameCentral Mine Planning And Design Institute Limited
Tender BriefCorrigendum : Supply, Installation, Testing And Commissioning Of Led Street Light, Ohtl Overhauling, Cabling, Wiring And Other Electrical Works At Kudumkela Exploration Camp, Raigarh (c.g.).
Last Date For Submission12th May, 2026
Opening Date13 May, 2026
Cost
Document Cost0.00
EMD19500.00
Estimated Cost1547257.00
Location
CityBilaspur
StateChhattisgarh

Register to see full details

BOQ Items
#ItemQtyUnits
1Supply and erection standard ACSR (aluminium conductor steel reinforced) confirming to IS 398-1961 of approved make at existing insulator at height upto 14m from ground level including stringing, binding with insulator, jointing wherever required, jumpering, tearing off connection etc complete etc. as per specification including clearing off obstacle if any --Squirrel 6/1/2.11mm dia with calculated aluminium area 20.98 sq.mm,weight 85 kg/ km (50 amps)5500.00metre
2Supplying, installation, testing and commissioning of 25 watt 230/250 volts LED street light fitting with all accessories like driver, heat sink made of die cast aluminium with IP 66 protection and 15 KV surge protection on pole bracket, including connection, earthing, Separate housing for driver etc complete as per specification and P.F. should be greater than 0.9. LED chip efficacy ratio * 120 lumens /watt.40.00nos.
3Painting of following height steel tubular pole with two coat of aluminium paint of approved brand including cleaning surface as per specification- Around 6 metre20.00nos.
4Shifting of solar street light complete set in the same campus as per the shadowfree area as per EIC guidance including all civil works required.10.00nos.
5Supply, installation , testing and commissioning of 25 Watt LED street light fitting with inbuilt battery of minimum 12 hour working with auto on-off facility as per sunlight over existing solar street light poles as per specification detailed.20.00nos.
12th May, 2026

3 Days Left

WhatsApp