Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4852304 |
|---|---|
| Organisation Name | Himachal Pradesh Irrigation And Public Health Department |
| Tender Brief | Annual Repair And Maintenance of Lwss From Seer Khad To Bhiyanu Peer Group Of Villages In Tehsil Ghumarwin District Bilaspur (sh Operation Of Pumping Machinery And Distribution System Of Water Supply For Sector Storage Tank Of Different Habitation For One Year). |
| Last Date For Submission | 15th Jul, 2026 |
| Opening Date | 15 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 42165.00 |
| Estimated Cost | 2108240.00 |
| City | Bilaspur (HP) |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS from Seer Khad to Bhiyanu Peer through skilled / unskilled manpower i.e chowkidar for maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge.. | 1 | Job |
| 2 | Description of main components of the scheme is as under:- | ||
| 3 | Civil works: 3 No pump house, 1No infiltration gallery 50 mtr , 3 Nos sump wekk, 7 Nos storage tans of various capacity). Rising main: 10685 Rmt, (Booster stage 125mm dia 70 Rmt,1st stage 150 Rmt 6115 Rmt,2nd stage 150mm dia 2625Rmt and 3rd stage 150mm dia=2340Rmt, 1st phase to Bhulwwai 80mm dia=2400 Rmt Distribtuon system: 181902 Rmt (20mm to 200mm dia) Pumping machinery :Booster stage:2x5=10HP,1st stage=4x50=200HP,2nd stage 4x80=320HP and 3rd stage 4x80=320HP. No of storage tank:2 Nos & sub storage tank 6 Nos Total working hours 76 per day : through , 12 Nos persons. Indicators to be mentioned:Average per day Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. Quantity of water lifted per day: litr ). Pumping hours per day= hrs and energy consumptoin per day Unit. |
8 Days Left