| 1 | Earthwork in excavation for structures as per drawing and technical specifications Clause 304 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material .The rate includes, octroi, Malkana , Toll tax , Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 35.55 | Per Cubic metre |
| 2 | Providing and Laying cement concrete 1:5:10 nominal mix ( One Cement is to five Sand is to Ten graded crushed stone aggregrate.) 40mm ( forty milimetre) nominal size with minimum cement contents 130 kg (One hundred thirty kilogram) per cubic metre and curring complete . including cost of form work for plain /reinforce concrete in retaining walls, breast wall as per drawing and MORD tecnical specification 2014 Clause 800 and 1200 including carriage of material with in all leads and lifts ,shoring and shuttering and curring complete including pumping or bailing out water (surface and sub soil water) up to all depth and any quantum of water including cleaning of slush which may arise out during dewatering and carriage of machinery, material ,tools equipment safety measures and including carriage of materials with in all leads lifts and other incidentals as per direction of Engineer-in-Charge.The rate includes, octroi, Malkana , Toll tax , Goods Service Tax, building and other construction work, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 68.10 | Per cubic metre |
| 3 | Back filling behind abutment , wing walls return wall complete as per drawings and technical specification clause 1204.3.8 as per direction of Engineer-In-Charge with in all leads and lifts and other incidentals. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
| 19.80 | Per cubic metre |
| 4 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm (one hundered milimeter ) dia PVC pipe of working pressure not less than 4kg/sqcm ( four kilogram per square centimeter) extending through the full width of the structures with slope of 1(V) (one vertical) :20(H) ( twenty horizontal) towards drawing face complete as per drawings and MORD technical specification 2014 Clauses 614, 709, 1204.3.7 . The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 42.00 | Each |
| 5 | Stone soling properly hand-packed filling interstices with Kharanja stone and consolidating with power road roller to the requested gradient and comber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HP.PWD specification. 150 mm (One Hundred fifty millimetre)spread thickness (finished work including materials and labour)as per direction of Engineer-In-Charge including carriage of material with in all leads and lifts and other incidentals as directed by the Engineer-In-Charge. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
| 85.03 | Per cubic metre |