Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4856137 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Restoration Of Rain Damages On Link Road From H/basti Balh Ward No.5 Gp Taroun Km 0/0 To /10 Sh Construction of Cement Concrete Work At Rd 0/300 To 0/445 |
| Last Date For Submission | 13th Jul, 2026 |
| Opening Date | 14 Jul, 2026 |
| Document Cost | 350.00 |
|---|---|
| EMD | 9900.00 |
| Estimated Cost | 491998.00 |
| City | Bilaspur (HP) |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Stone soling properly hand-packed filling interstices with Kharanja stone and consolidating with power road roller to the requested gradient and comber including spreading watering and rolling of binding materials moorum or earth etc including carriage of materials within all leads and lifts and other incidentals as per direction of the Engineering-In-Charge.. The rate includes, octroi, Malkana , Toll tax , Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 66.34 | Per cubic metre |
| 2 | Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads and lifts and other incidentals as per direction of the Engineering-In-Charge.. The rate includes, octroi, Malkana , Toll tax , Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 55.28 | Per cubic metre |
6 Days Left