Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5017186 |
|---|---|
| Organisation Name | Himachal Pradesh Irrigation And Public Health Department |
| Tender Brief | (sh Deployment Of Manpower For Operation Of Pumping Machinery And Distribution System Of Water Supply From Sector Storage Tank To Different Habitations For One Year) |
| Last Date For Submission | 29th Jul, 2026 |
| Opening Date | 30 Jul, 2026 |
| Document Cost | 350.00 |
|---|---|
| EMD | 15610.00 |
| Estimated Cost | 780400.00 |
| City | Bilaspur (HP) |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Deoth Boh Humbar and LWSS Kahli Changer whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge. | 1.00 | Job |
| 2 | Description of main components of the scheme is as under:- Civil works: 4 No pump house, sump well, filter beds, sedimentaiton tank. LWSS Deoth Humber Rising main: 1st stage 65mmdia=1320 Rmt, Pumping machinerey: 1st stage: 2x40=80 HP Approximate length of distribution system=25000Rmt. No. of storage tank 4 Nos, No of habitation=9 Nos Total Working hours 31.30 hours- through 5 Nos. of person (PO= 1 No and Helper/Beldar=4 Nos. LWSS Kahli Changer: Rising main: 1435 Rmt. Pumping machinery:1st stage: 2x30=60HP Distribution system: Approximate length of distribution system=18000Rmt. Total main storage tank: 2 Nos, Nos of habitations= 3 Nos, Total working hours 28.30 hours: through 5 No person ( PO= 1 No., Chowkidar= 1 No and Helper/Beldar= 3 Nos). Indicators to be mentioned: (i) Nos of complaints received through differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. (ii) Quality of water lifted per day. |
8 Days Left