Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5017196 |
|---|---|
| Organisation Name | Himachal Pradesh Irrigation And Public Health Department |
| Tender Brief | (sh Deployment Of Manpower For Operation Of Pumping Machinery And Distribution System Of Water Supply From Sector Storage Tank To Different Habitations For One Year). |
| Last Date For Submission | 29th Jul, 2026 |
| Opening Date | 30 Jul, 2026 |
| Document Cost | 350.00 |
|---|---|
| EMD | 13510.00 |
| Estimated Cost | 675350.00 |
| City | Bilaspur (HP) |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Sair Dobha Karot whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge. | 1.00 | Job |
| 2 | Description of main components of the scheme is as under:- Civil works: 1 Nos pump house, Slow sand WTP, Clear water Tank and collection Tank. Rising main: LWSS Sair Dobha Karot 1st Scheme: Booster stage 100 mm dia 300 Rmt 1st stage 125 mm dia= 2800 Rmt. Pumping machinery: LWSS Sair Dobha Karot 1st Scheme: Booster stage 2x5HP=10 HP, 1st stage 2x60=120 HP. Approximate length of distribution system=70.00KM No. of storage tanks=5 Nos., Nos of habitation=19 Nos, Total working hours 25.30 hours-through 5 Nos. of person (Chowkidar=1 No Helper=2 Nos and Beldar=2 Nos.) Indicators to be monitored: (1) Nos of complaints received through different mode such as C.M. Sankalap, E. Samadhan, complaint register etc. (2) Quantity of water lifted per day. (3) Nos of Pumping hours per day and energy consumption per day. |
8 Days Left